DCK – De Caking

The VibroBLAST Air [DP] DCK line of machines is designed to ensure a wide MULTITASKING process suitable for POST-PROCESS Selective Laser Sintering machines after SLS or MJF.

Starting from an SLS or MJF cake before the de-structuring or de-caking operation, normally performed by hand and followed by manual or barrel blasting, the new range of VibroBLAST Air [DP] DCK machines can automatically provide:

  1. De-structuring of the build, or de-caking
  2. Additive powder recovery and automatic vibro-screening
    with possible ultrasonic option, for top efficiency
  3. Successive vibro-sandblasting of sintered components
  4.  If necessary, further sanding of the components
    Want to know more? (video):

Between Ai and Italian Style

Between Artificial Intelligence and Concreteness, the state of art in Tumbling and Vibratory Finishing We asked “Gemini.google.com”: What is the state of the art of tumbling

Software by ROLLWASCH

Choosing the right PLC software for surface treatment machines is crucial to ensure efficiency, flexibility, and safety in the production process. Here are some key features

Rollwasch Italiana Srl sarà chiusa per le vacanze estive dal 01/08/2025 al 26/08/2025 compreso.

Rollwasch Italiana Srl will be closed for summer holidays from 01/08/2025 to 26/08/2025 included.

Rollwasch Italiana Srl rimarrà chiusa il 01/05/2025 ed il 02/05/2025

Rollwasch Italiana Srl will be closed on 01/05/2025 and 02/05/2025

I nostri uffici saranno chiusi da venerdì 18/04/2025 dalle ore 12.00 fino al 21/04/2025 incluso.

Our offices will be closed from Friday 18/04/2025 at 12.00 till 21/04/2025 included.

I nostri uffici saranno chiusi per le festività natalizie dal 23/12/2024 al 06/01/2025.

Our offices will be closed for Christmas Holiday from 23/12/2024 till 06/01/2025.