Wastewater filtration with automatic sludge removal ARW-S

Preview 2025 – Wastewater filtration with automatic sludge removal ARW-S

Here’s what it’s all about:

Rollwasch® has developed the innovative automatic cleaning process of centrifuged sludge, in its RFC machines, called ARW-S, acronym for Automatic Roto Wash – Steam (Patented).

Thanks to the synergy between dry saturated steam and water (filtered and recycled in a closed circuit) pumped at pressures between 150 and 250 bar through a special “blade” nozzle, the sludge accumulated every “X” minutes of centrifugal filtration process is removed quickly and completely, then transferred to a special collection big-bag.

This type of systems ensures up to 5 vibrofinishing or tumbling units are served, allowing significant reductions in annual water consumption, containment of the consumption of liquid finishing compounds and the programming of operating recipes that can be adapted to the various production scenarios that occur during the production year.

All systems can operate with coagulants or flocculants with automatic dosing, have automatic replenishment of concentration of finishing compounds, can use the automatic periodic replacement function of wastewater with automatic replenishment and provide for powering only the operational finishing units, thanks to a communication cable that communicates the on/off status of each machine.

This type of system can operate 24/7 without problems, ensuring maximum efficiency and a rapid return on investment.

Between Ai and Italian Style

Between Artificial Intelligence and Concreteness, the state of art in Tumbling and Vibratory Finishing We asked “Gemini.google.com”: What is the state of the art of tumbling

DCL Dyeing Colour Lab

DCL Dyeing Colour Lab A new range of pigments for dyeing has been improved and optimazed by DCL (Dyeing Colour Lab), in a Joint R&D program

Rollwasch Italiana Srl rimarrà chiusa il 01/05/2025 ed il 02/05/2025

Rollwasch Italiana Srl will be closed on 01/05/2025 and 02/05/2025

I nostri uffici saranno chiusi da venerdì 18/04/2025 dalle ore 12.00 fino al 21/04/2025 incluso.

Our offices will be closed from Friday 18/04/2025 at 12.00 till 21/04/2025 included.

I nostri uffici saranno chiusi per le festività natalizie dal 23/12/2024 al 06/01/2025.

Our offices will be closed for Christmas Holiday from 23/12/2024 till 06/01/2025.